Week 3 of the kitchen remodel was productive - sheetrock, sheetrock, and more sheetrock - and so very dusty, in spite of the temporary sheeting that was hung. The final day of that week, which was when the crew did texturing, was the worst, but it definitely did improve the look of the space a lot.
It felt like we were rewarded in week 4, with the cabinets arriving!
It took just three days for all of the cabinets to be installed, with a start on trim being added - see top of upper cabinets on left side, below.
Also in week 4, the flooring guy stopped by to see our existing hardwoods in person, and will drop wood for the kitchen flooring off on Monday. AND the countertop people came by to make their templates. Sounds like it'll be October 1 before they are back to install. So some major progress behind us, and more still ahead. As our contractor said, "every day from here on will be something new and exciting."