Completed projects
My Sherbet Pips Comic Strip Quilt is done!
The Dream Big top and backing are done and got delivered to the long-arm quilter yesterday!
I continue to make bow-tie blocks for the Prairie Women Sewing Circle mini quilt - about 65/120 are done.
My Hoopla charm pack got combined with the Scrapbuster swap. I am loving this new {to me} method of making half-square triangle blocks and have a very good start on these blocks.
Ongoing projects
The Dream Big top and backing are done and got delivered to the long-arm quilter yesterday!
I continue to make bow-tie blocks for the Prairie Women Sewing Circle mini quilt - about 65/120 are done.
My Hoopla charm pack got combined with the Scrapbuster swap. I am loving this new {to me} method of making half-square triangle blocks and have a very good start on these blocks.
Ongoing projects
* Cappuccino Bali Pop "Light & Shadow". Still on the agenda.
Upcoming projects
* Afternoon Snack table runner adapted from this pattern by G. E. Designs.
* Shades of Grey. Ideas are still percolating - tentatively to include my variety of KONA grays, and then adding that splash of {as yet undetermined, but I think I've decided} color. . .
* Shades of Grey. Ideas are still percolating - tentatively to include my variety of KONA grays, and then adding that splash of {as yet undetermined, but I think I've decided} color. . .
* Stash quilt - Sew Katie Did's zig zag quilt. I'm hoping to get started on this at Katie's HST class on June 29!
* Quilts for our siblings.
On hold for a while
Block-a-palooza quilt along needs basted and quilted.
On hold for a while
Block-a-palooza quilt along needs basted and quilted.
That's it for this week! Be sure and head over to Freshly Pieced to wander through other fun W.i.P.s!